Bid / Tenders

Log in / Register
Chilliwack Creek Pump Station Preliminary Design Back
Closing Information
Successful Bidder:
Bidder: McElhanney Ltd
Bidder: Urban Systems Ltd.
Bidder: Stantec Consulting Ltd
Bid Information
Work:

The City of Chilliwack is requesting Expressions of Interest from qualified Proponents who possess the required personnel, experience and resources to provide preliminary engineering design for the Chilliwack Creek Pump Station.

The objective of this Project is to complete climate vulnerability, seismic and structural assessments of an existing drainage pump station and floodbox located on Chilliwack Creek in the City of Chilliwack to support the subsequent preliminary design of pump station/floodbox upgrades (Phase 2). The pump station and floodbox were constructed almost 75 years ago and serve an urban/agricultural catchment area of approximately 8,400 Ha, forming a critical component of Chilliwack’s flood protection system. The infrastructure is integrated into Chilliwack's dike system that protects the community from Fraser River floods.
The subsequent phase of this project would include preliminary design of the mechanical, electrical and structural upgrades, including assessment of conversion to a fish-friendly structure since Chilliwack Creek and many of its tributaries are salmon-bearing. The preliminary design would be suitable for delivery through a design-build project.

Closing:
March 8, 2023 3:00 PM

*

Contact(s):
Frank Van Nynatten
Project Manager
(604) 793-2907
[email protected]
 
Attached Documents
Description Category Format Size
Chilliwack Creek Pump Station Preliminary Design Document Adobe Acrobat 449KB
*To view bid documents, you must have Adobe Acrobat Reader installed on your machine.